CTCAC Updates Placed-In-Service Website Including New Guidance on Submissions

In mid March, CTCAC issued several memos so we thought we’d summarize them here for you.

The Placed-in-Service webpage was updated to include guidance on the requirements for PIS submissions. These requirements are available on the following webpages:

The following forms in the Placed-in-Service webpage have been updated to conform with the requirements.

  • Form B
  • Owner Certification
  • Architect Certification
  • Energy Analyst Certification
  • Sustainable Building Method Points Certification
  • Accessibility Requirements (newly added)
  • Minimum Construction Standards (newly added)
  • The Excel checklist previously used for PIS application requirements has been removed.
  • All requirements, instructions, and guidance have now been fully consolidated into newly published webpages: 
    PIS Submission and Guidance
    Additional Guidance for PIS E-App Update

For general Placed in Service Package and Tax Form(s) Request questions, please refer to: CTCAC Placed-in-Service Items

For general information visit: California Tax Credit Allocation Committee